Roadworks - drummoyne
46 posts
• Page 1 of 2 • 1, 2
Roadworks - drummoyneThe contractors started digging up wrights rd (between Drummoyne ave and Wolseley st) this morning in preparation for it to be resurfaced.
I know a few people use it on their commute. Definately not bike friendly so best to avoid it - work is scheduled to take 5 days according to the residents' notice. map Last edited by JV911 on Mon May 10, 2010 2:59 pm, edited 3 times in total.
Re: RoadworksJust a good excuse to take the shortcut on the footpath!
Re: Roadworks - wrights rd drummoynePretty much finished by this morning, it seems. The road was open again.
Re: Roadworks - wrights rd drummoyneit was in fact 99% finished on friday arvo!
apart from a few small spots where there had been parked cars. and they were sawing some small sections this morning i assume for services.hydrants etc (waking me up in the process)
Re: Roadworks - wrights rd drummoyneso just days after resurfacing the rd they've decided to dig parts (edit: i.e. the length of the street!) of it up to run new pipes
it's close to the gutter so ok to ride
Re: Roadworks - wrights rd drummoyne
it appears to be a case of council planning, or a failure thereof. Downer EDI were contracted to resurface the rd and a separate contractor to lay the new pipes. it would make sense to lay the pipes and then resurface the rd. i was speaking to one of the contractors yesterday arvo and he said these types of balls-ups happen all the time...good to see out tax dollars being spent efficiently
Re: Roadworks - wrights rd drummoyneLOL... it's called "nation building"!
Re: Roadworks - wrights rd drummoynenot sure what they're planning but there is machinery parked in the bike lane on wolseley st between rights rd and the entry to the gladesville bridge shared path - so be careful if you're coming down wrights rd (westbound) and turn normally right onto wolseley to get to the bridge!
it seems a number of residents complained to the coulcil and we were told that downer would return the road to "as new" condition...the sections where they laid the pipes are worse than prior to the resurfacing
Re: Roadworks - wrights rd drummoyne
I think they may be starting on the work mentioned here to restrict access to the path (which is not actually shared, according to the signs
Re: Roadworks - wrights rd drummoyneCAUTION: somone has dropped a truck-load of sand on the corner of drummoyne ave and victoria place
Re: Roadworks - drummoyneGood news - there are now 'bike gaps' in the barrier between the two parts of Wrights Road at the Seymour Street junction. They were opened late last week.
This means you no longer have to ride the footpath to get between the two halves of Wrights Road. There is also what appears to be a bike lane (as yet unlabelled) up the side of the bus turning circle at the Wrights Road/Lyons Road junction. Last edited by gavinr on Mon May 31, 2010 10:07 am, edited 1 time in total.
Re: Roadworks - drummoyne
haven't noticed that - i always go up collingwood roadworks on lyons rd west too - eastbound lane closed near the former golf driving range
Re: Roadworks - drummoyne
no sooner had they finished the aforementioned work than another crew turned up and has re-ripped utp that secion of "bike path". furthermore the work now extends actoss the wrights/wolseley intersection and there is a road plate across the road
copped a front puncture (westbound) due to debris on the road this morning...hit a fair-sized rock just after advising a ninja to get some lights
Re: Roadworks - drummoyne
That is correct, it should be seperated by a kerb so the buses won't cut the corner. Any more cycling related feedback on this area (i have an involvement in the project and am interested how it turned out)? By the way, i'm working on fixing the pinch point around the bus stops near the burned down pub at rozelle. Should be a lot smoother ride! ![]() n=8 (2011 road, 2004 road, 2010 track, 2009 foldup, 1990 hybrid, 1992 indoor trainer, 2007 road now a rental, 1970's step through)
Re: Roadworks - drummoyne
It does, although I have to say I never really had a problem here, buses tend to be parked up and so there was little risk of them hitting me As for other things in the area, the newly painted cycle lanes on Renwick St are fine between Day St and Edwin St, but from Edwin St up to Lyons Road they are pretty much unusable as the road surface they enclose is rough and full of potholes. The main section of road is OK here, it's just the side section within the white lines where the problem is. I'm also curious about what is happening regarding cycles at the Victoria Road/Cary St junction (just before Iron Cove Bridge). There's been a lot of roadworks here for a couple of weeks now but it's not easy to see what the end result is going to be. I've had a few near misses here in the past, trying to cross Cary St on the Victoria Road footpath when some idiot has turned left without indicating and almost taken me out. If the chances of that happening are reduced I'll be happy
Re: Roadworks - drummoyneYou could get them to remove the cycle lanes from Renwick St altogether and if they must paint cycles on the road, do so in the traffic lane. They are 100% doorzone, encourage car drivers to block or double entry to the stop sign area and have terrible surfacing and make the act of backing a car out of odd driveway present as dangerous as possible for riders.
Its a back road that parallels a major road that entirely cuts off that peninsula, bicycles are fine (and safer) in the traffic lane, and are not holding up traffic. I think councils should be encouraged to stop creating "cycle lanes" that are 24x7 zoned for parking, and if they are going to paint a cycle on ANY LANE anywhere, it should be painted in the middle of the lane. That way mixed use lanes hide the cycle when parked on and thus stop confusing everyone (drivers and riders alike) as to where the bicycle should be ridden.
Re: Roadworks - drummoyne
Cyclists will be riding on a separated bike lane on the new bridge, then continue along a shared path on vic rd, or heading down a ramp to join the bay run. I think to get over to the other side of vic road riders will have to cross at park ave. I'm also unsure of how cyclists get to the new bridge from the eastern side but i'll look into it. Good riddance to Cary st intersection and the skinny path along the old bridge! ![]() n=8 (2011 road, 2004 road, 2010 track, 2009 foldup, 1990 hybrid, 1992 indoor trainer, 2007 road now a rental, 1970's step through)
Re: Roadworks - drummoyneBy the way, there will be a new seperated lane either side of renwick st.
![]() n=8 (2011 road, 2004 road, 2010 track, 2009 foldup, 1990 hybrid, 1992 indoor trainer, 2007 road now a rental, 1970's step through)
Re: Roadworks - drummoyne
you mean like this? ![]()
Re: Roadworks - drummoyne
I keep laughing at that one. It''s a cracker! I think the council had a big influence in that one on gibbs st, whereas the rta has control on and around the victoria rd upgrade. ![]() n=8 (2011 road, 2004 road, 2010 track, 2009 foldup, 1990 hybrid, 1992 indoor trainer, 2007 road now a rental, 1970's step through)
Re: Roadworks - drummoyne
Hmm, don't like the sound of that. Are you saying we can only cross Iron Cove on the south side in future? That means I'll need to cross Victoria Road twice to get from the Balmain peninsula into Drummoyne (north of Victoria Road).
Re: Roadworks - drummoyne
Looks like they are retaining the path on the old bridge, they are linemarking all the way along the citybound side for both directions of cycle traffic from thornley to anzac bridge, opening up the area where the steps down to the park near the bridge city side (to avoid near misses with pedestrians). The Cary st intersection is open for discussion at a very high level so debates continue what to do with that dodgy arrangement as it stands. Westbound they are adding the separated lane on the new iron cove bridge for those who do the loop around the bay (so they don't need to cross over vic road any more) stretching back to moodie st (where it links up with the bike route on waterloo st). To rejoin Vic rd path, you will need to cross at thornley. ![]() n=8 (2011 road, 2004 road, 2010 track, 2009 foldup, 1990 hybrid, 1992 indoor trainer, 2007 road now a rental, 1970's step through)
Re: Roadworks - drummoyne
Good! Thanks for updating me (and everyone else) on this.
Even better! I've seen and been involved in a few near misses with pedestrians (and dogs) here.
There had been a bit of a change to the layout there last night, it looks like they are making the corner shallower from Vic Road left into Cary. Still a way to go but from how it looks just now the speed of cars through there is just going to increase, making it more difficult to cross Cary to get to the bridge.
Re: Roadworks - drummoyne
The problem is with the bus stop a few metres up. They are doing work at the bus stop, but they aren't sure how the cycleway is going to interact with the new works. I will be interested to know what solutions they come up with! ![]() n=8 (2011 road, 2004 road, 2010 track, 2009 foldup, 1990 hybrid, 1992 indoor trainer, 2007 road now a rental, 1970's step through)
Re: Roadworks - drummoyne
do you know anything about what's going on around lyons rd west? is it me or are they narrowing the road??? the west-bound cycle lane was only 1m wide to begin with and east-bound non-existant
46 posts
• Page 1 of 2 • 1, 2
Who is onlineUsers browsing this forum: No registered users |
Bikes & Gear Online:
|