Page 1 of 1

Floating Walkway Replacement Announcement

Posted: Sun Nov 13, 2011 7:05 pm
by beauyboy
http://www.brisbanetimes.com.au/queensl ... 1n7h1.html
http://www.brisbanetimes.com.au/queensl ... 1n8t0.html
http://www.brisbane.qld.gov.au/traffic- ... /index.htm
The replacement to the former floating walkway has finally been announced. It will be a fixed structure with a segragated path that with the finished surface level above the King tides that frequently shut down the Bicentennial Bikeway. I have to say at first sight it meets the four terms as were layed out in the CBD BUGs media release in Augest. Now if only it is built before 2014 sometime :roll:

Donald