Does anyone know if this is the start of the fabled Guildford to Chester Hill route?
Recently I tried riding east from Guildford following as close as possible to the pipeline to see what sort of route it would make and found it was impossible to stay close to the pipeline -- it abuts the back of housing, parklands, industrial estates etc for long stretches. Ended up zig-zagging to the other side of Chullora. I reckon I covered twice the distance I would've had I rode directly adjacent to the pipeline and there was some very ugly traffic on the way.
Previously I've questioned the value of a Guildford to Chester Hill path on this forum, but considering what a "clean" ride it would be, I'd be looking forward to finding excuses to ride the route.
- g-boaf
- Posts: 21439
- Joined: Mon Sep 26, 2011 6:11 pm
Re: Prospect path being extended east?
Postby g-boaf » Fri Aug 09, 2013 1:24 pm
It would be very nice for them to complete that path all the way through Rookwood so it can just about link up with the Cooks River path.
-
- Posts: 336
- Joined: Fri Jan 04, 2013 4:41 pm
Re: Prospect path being extended east?
Postby TTar » Fri Aug 09, 2013 7:57 pm
g-boaf wrote:They close over the top of the cable trenches nicely and then fill it with earth on the top.
It would be very nice for them to complete that path all the way through Rookwood so it can just about link up with the Cooks River path.
I hope you're wrong and the new recently completed bridge over the railway line at Guildford gives me cause to think you just might be.
The bridge duplicates the existing perfectly serviceable bridge, it's just a few metres away from the old bridge but lines up with the new "path" excavations either side of the rail line. It's a proper bridge too, designed to carry humans (on foot or bike) -- you wouldn't need such a construction to carry just cables.
Also, preparations appear to be being made for new street crossings on the western side of the line where the "path" crosses the streets. I don't know much about laying underground cables or building bicycle paths, but there's sections that look as though the could've been covered up with earth already if that's what they were to do and now that I think of it, there isn't big piles of soil set aside to re-cover the excavations.
Maybe it's just wishful thinking, but if I get a chance I'll conduct even more critical examinations over the weekend and report back to the wise members of BNA.
- g-boaf
- Posts: 21439
- Joined: Mon Sep 26, 2011 6:11 pm
Re: Prospect path being extended east?
Postby g-boaf » Fri Aug 09, 2013 8:20 pm
- QuangVuong
- Posts: 1794
- Joined: Sun Feb 24, 2013 5:04 pm
- Location: Villawood, Sydney
Re: Prospect path being extended east?
Postby QuangVuong » Fri Aug 09, 2013 9:23 pm
And with the current paths, how do you guys hit Cooks River from Sefton? Waldron/Carlingford is quite a busy road together with Amy St.
Blog: https://villaveloframes.wordpress.com/
FB & IG: @villaveloframes
-
- Posts: 1214
- Joined: Sat Jun 06, 2009 8:05 pm
- Location: Bright, Victoria
Re: Prospect path being extended east?
Postby Hergest » Sat Aug 10, 2013 8:02 pm
I wouldn't be surprised though if all it did was carry cables as some of the infrastructure that has been built for these cables is rather significant with thousands of tonnes of concrete being used. I'd hate to be the bloke whoever has to dig a faulty one up.
- gpz1100
- Posts: 45
- Joined: Fri Jan 18, 2013 3:44 pm
- Location: sydney
Re: Prospect path being extended east?
Postby gpz1100 » Sat Aug 10, 2013 8:44 pm
- g-boaf
- Posts: 21439
- Joined: Mon Sep 26, 2011 6:11 pm
Re: Prospect path being extended east?
Postby g-boaf » Sat Aug 10, 2013 8:50 pm
The new bridge I've heard will replace the old one though, with a better surface than the rickety old wooden one.
I've tried contacting the people responsible for the project but got no answer.
Extending the path further than Regents Park looks difficult with some tricky road and rail crossings.
-
- Posts: 336
- Joined: Fri Jan 04, 2013 4:41 pm
Re: Prospect path being extended east?
Postby TTar » Sun Aug 11, 2013 11:07 am
According to what little literature I can find on the subject, the path is indeed proposed to follow the pipeline. I'm unfamiliar with Hector, but yes, passing under Woodville would require some engineering -- I think the current pipeline underpass there contracts to virtually just the width of the pipes. I doubt they'd want to, or even could fit the electricity cables through that bottleneck, so they may have to excavate a bicycle-path-shaped tunnel through there and elsewhere.QuangVuong wrote: But where is the path gonna run though? If its gonna follow the pipes, itll mean itll pass under a couple big roads(Woodville, Hector)?
Hergest wrote:
I wouldn't be surprised though if all it did was carry cables as some of the infrastructure that has been built for these cables is rather significant with thousands of tonnes of concrete being used.
Yeah, but it's completely enclosed in those cages to stop people falling off and ne'er-do-wells chucking stuff at passing trains. Plus, they had lengths of handrails sitting on the bridge awaiting installation. Stop party pooping, Hergey!
You stop party pooping, too, boafy!g-boaf wrote:I think Hergest is right - it is just the cable trenches and the normal filling process over them.
I think they might still be there. You're right, real Deliverance stuff; cue banjo - diding dink, dink dink, dink dink, dink dink...gpz1100 wrote:,we used to ride motorbikes along the pipeline between barbers rd & Campbell hill rd,there was 1 house along that pipeline that used to get really upset and try and chase us down with there bikes and dogs.they would set wire between trees to try and screw kids out havin some fun.they where deadset rednecks,like out of a movie or something,it would be great if there was a public path behind there property now.
These cables will be laid all the way to Potts Hill and it's due for completion in December 2013. It's almost impossible to get any coherent info out of various authorities (as usual). I reckon the reason for this is that no one wants to held accountable for something/anything -- the cables are being laid by private enterprise, but I'm not sure who'll be responsible for the path -- probably a combination of a couple of councils and NSW govt. So don't hold your breath for those rivals to present a united front and say, "sure, we'll be getting started on the path as soon as the cables are laid in a cooperative manner and none of us will fuss about taking credit or accepting blame if something goes wrong..."
It'll be interesting to hear the excuses for not getting started next year. And the year that, and the year after...
Meantime, I know a of couple of hidden, but easily accessible entry points to the pipeline easement for some illegal mountain or CX biking if anyone's interested.
- g-boaf
- Posts: 21439
- Joined: Mon Sep 26, 2011 6:11 pm
Re: Prospect path being extended east?
Postby g-boaf » Sun Aug 11, 2013 1:50 pm
I sure hope you are right - it'll be nice if it is done by December 2013.TTar wrote:According to what little literature I can find on the subject, the path is indeed proposed to follow the pipeline.
- QuangVuong
- Posts: 1794
- Joined: Sun Feb 24, 2013 5:04 pm
- Location: Villawood, Sydney
Re: Prospect path being extended east?
Postby QuangVuong » Mon Oct 21, 2013 11:54 am
And once you are there, what is the quickest way to hit the Cooks River Path? If I head down Amy, then Weeroona Rd, you can't continue on Weeroona as theres a gate. I need to turn up East, then head around Railway St before entering the Cooks River Path. Ive never tried going through the cemetary though.
Blog: https://villaveloframes.wordpress.com/
FB & IG: @villaveloframes
- g-boaf
- Posts: 21439
- Joined: Mon Sep 26, 2011 6:11 pm
Re: Prospect path being extended east?
Postby g-boaf » Mon Oct 21, 2013 12:49 pm
They are fixing the dug out bits of the path near Hyland Road (seen yesterday).
-
- Posts: 1214
- Joined: Sat Jun 06, 2009 8:05 pm
- Location: Bright, Victoria
Re: Prospect path being extended east?
Postby Hergest » Mon Oct 21, 2013 4:03 pm
I might be wrong. I hope i'm wrong as a new pathway following the cables would be most welcome.
It's good to see that the bitumen laid was only temporary. I'm sure a full re-instatement of every path was in the contract for Diona but sometimes it can get left so to see them working on them now is reassuring.
Now all we need is for Reconciliation Road to stay permanently closed while Holroyd Council and the State government argue the toss over who has to look after it.
- g-boaf
- Posts: 21439
- Joined: Mon Sep 26, 2011 6:11 pm
Re: Prospect path being extended east?
Postby g-boaf » Mon Nov 25, 2013 2:11 pm
http://www.parracity.nsw.gov.au/__data/ ... kePlan.pdf" onclick="window.open(this.href);return false;
There are some photos of the Eastern end of the path showing the works on the Sydney Cyclist forum.
There are a lot of works still going on along the Prospect Path, especially up near Hyland Road where the bumpy little side diversion is back in use again (the main path is completely dug up).
Here is hoping that when Prospect Dam opens again, that route will remain open 24/7. It's a major route for many people and should be open, especially given how much time it saves.
-
- Posts: 1214
- Joined: Sat Jun 06, 2009 8:05 pm
- Location: Bright, Victoria
Re: Prospect path being extended east?
Postby Hergest » Wed Nov 27, 2013 7:51 pm
- g-boaf
- Posts: 21439
- Joined: Mon Sep 26, 2011 6:11 pm
Re: Prospect path being extended east?
Postby g-boaf » Wed Nov 27, 2013 10:46 pm
I'm being sarcastic, but it wouldn't surprise me. My pessimism seems like it was proven correct.
-
- Posts: 11
- Joined: Sat Sep 07, 2013 9:41 am
- Location: NSW 2162
Re: Prospect path being extended east?
Postby Scandrew » Thu Mar 20, 2014 4:21 pm
-
- Posts: 76
- Joined: Sun Mar 09, 2014 1:41 pm
Re: Prospect path being extended east?
Postby sankari » Fri Mar 21, 2014 12:08 am
There's a hotmix path about 1.5 car widths on the northern side of the pipes from Railway Terrace to Kay St, and possibly beyond. I'm speculating this is all related to pipes maintenance. For months now beginning with the closure of Prospect Reservoir, I've seen workers on the canal cycleway starting at the Prospect Reservoir end. More recently, there's been closures of the path between the Guildford pipehead and the railway. And now they've progressed past the railway, where no path exists, they need to build a service road for vehicles and machinery.
Let's hope that the whole length of pipeline requires maintenance, and that all of it requires a service road to be built. Then us cyclists can lobby to use it and leech off the public purse once again
-
- Posts: 1214
- Joined: Sat Jun 06, 2009 8:05 pm
- Location: Bright, Victoria
Re: Prospect path being extended east?
Postby Hergest » Sun Mar 23, 2014 1:04 pm
-
- Posts: 82
- Joined: Wed Apr 02, 2014 5:11 pm
- Location: Bonnyrigg
Re: Prospect path being extended east?
Postby SteveTheTiger » Wed Apr 02, 2014 5:37 pm
http://www.transgrid.com.au/projects/pr ... fault.aspx
- biker jk
- Posts: 7009
- Joined: Tue Nov 17, 2009 6:18 pm
- Location: Sydney
Re: Prospect path being extended east?
Postby biker jk » Sat Jun 07, 2014 8:24 pm
The workmen were there this morning dismantling the old wooden plank bridge. No signs further down Railway Tce to let cyclists know it was closed. I had to detour via Guildford Station.g-boaf wrote:Eventually the timber one will start falling apart (some of the planks are already loose). They could just let it fall into disrepair and make people use the stairs at Guildford station.
I'm being sarcastic, but it wouldn't surprise me. My pessimism seems like it was proven correct.
- g-boaf
- Posts: 21439
- Joined: Mon Sep 26, 2011 6:11 pm
Re: Prospect path being extended east?
Postby g-boaf » Sat Jun 07, 2014 8:37 pm
It's easier to go through Merrylands shopping centre area and through the back streets past the Merrylands velodrome and then join the T-way lane. Go up past Merrylands HS and do a left turn and join the canal from there. That's the way I go now. Or you can go along the M4 path and turn off at the sporting fields and then use Walpole Street.biker jk wrote:The workmen were there this morning dismantling the old wooden plank bridge. No signs further down Railway Tce to let cyclists know it was closed. I had to detour via Guildford Station.g-boaf wrote:Eventually the timber one will start falling apart (some of the planks are already loose). They could just let it fall into disrepair and make people use the stairs at Guildford station.
I'm being sarcastic, but it wouldn't surprise me. My pessimism seems like it was proven correct.
- QuangVuong
- Posts: 1794
- Joined: Sun Feb 24, 2013 5:04 pm
- Location: Villawood, Sydney
Re: Prospect path being extended east?
Postby QuangVuong » Sun Jun 08, 2014 11:54 am
Blog: https://villaveloframes.wordpress.com/
FB & IG: @villaveloframes
- g-boaf
- Posts: 21439
- Joined: Mon Sep 26, 2011 6:11 pm
Re: Prospect path being extended east?
Postby g-boaf » Sun Jul 20, 2014 12:07 pm
-
- Posts: 1214
- Joined: Sat Jun 06, 2009 8:05 pm
- Location: Bright, Victoria
Re: Prospect path being extended east?
Postby Hergest » Sun Jul 20, 2014 1:00 pm
g-boaf wrote:I noticed down past Merrylands station where the path used to end and you'd be forced to take to the road, they've continued the shared path now up to the side street. Quite convenient.
Yep, that's been done a fair while now and it saves having to do a bit of a salmon when you come back up from the Woodville Road. I feel a bit sorry for the one bloke who used to have an immaculate bit of lawn out the front as that's all gone under the path now.
- General Australian Cycling Topics
- Info / announcements
- Buying a bike / parts
- General Cycling Discussion
- The Bike Shed
- Cycling Health
- Cycling Safety and Advocacy
- Women's Cycling
- Bike & Gear Reviews
- Cycling Trade
- Stolen Bikes
- Bicycle FAQs
- The Market Place
- Member to Member Bike and Gear Sales
- Want to Buy, Group Buy, Swap
- My Bikes or Gear Elsewhere
- Serious Biking
- Audax / Randonneuring
- Retro biking
- Commuting
- MTB
- Recumbents
- Fixed Gear/ Single Speed
- Track
- Electric Bicycles
- Cyclocross and Gravel Grinding
- Dragsters / Lowriders / Cruisers
- Children's Bikes
- Cargo Bikes and Utility Cycling
- Road Racing
- Road Biking
- Training
- Time Trial
- Triathlon
- International and National Tours and Events
- Cycle Touring
- Touring Australia
- Touring Overseas
- Touring Bikes and Equipment
- Australia
- Western Australia
- New South Wales
- Queensland
- South Australia
- Victoria
- ACT
- Tasmania
- Northern Territory
- Country & Regional
Who is online
Users browsing this forum: No registered users
- All times are UTC+10:00
- Top
- Delete cookies
About the Australian Cycling Forums
The Australian Cycling Forums is a welcoming community where you can ask questions and talk about the type of bikes and cycling topics you like.
Bicycles Network Australia
Forum Information
Connect with BNA
This website uses affiliate links to retail platforms including ebay, amazon, proviz and ribble.