Should be good, hopefully we can do a full LBG lap now
Jerra Wetlands Cycle Path
19 posts
• Page 1 of 1
Jerra Wetlands Cycle PathSo according to the TAMS website, the new bike path is supposed to be opening Thurs nite at 6pm, thus my first opportunity will be Friday to ride it. Anyone else keen for a look on Friday?? Or does anyone know if its opening/not opening.
Should be good, hopefully we can do a full LBG lap now Lucas Hayden
Current Ride: BMC SSX01 ![]()
Re: Jerra Wetlands Cycle PathI ride past their everyday, from what I can see from Diary Road through the car park, it looks very good, nice wide concrete path.
Re: Jerra Wetlands Cycle PathI might head that way on Fri and check it out. Not sure what time though
Current Ride: Giant 2010 TCR Advanced 1
Re: Jerra Wetlands Cycle PathIt's lovely, I have already ridden it on Easter Saturday - the construction fences were easy to get around. It was pretty much finished unless they were going to paint a centre line on it.
Steph
Re: Jerra Wetlands Cycle Path
This morning I noticed a chalked centre line, so paint shouldn't be far away.
Re: Jerra Wetlands Cycle PathThis is the link to complete LBG right? How far will a full lap be now? I'll have to try and crank one out every morning prework methinks...
Re: Jerra Wetlands Cycle PathI rode part of it last weekend, nice surface. Somebody told me it's been built to keep bikes off the wetlands walking paths.
![]()
Re: Jerra Wetlands Cycle Pathjust did a complete lap with a mate.. we did 32kms
the new part is nice around the wetlands, bugger all road to ride on!!! chalk is still there and some minor clean up to do.... but its good Lucas Hayden
Current Ride: BMC SSX01 ![]()
Re: Jerra Wetlands Cycle PathI did it as well, the entire LBG loop clocked in at about 28.5km.
Still a bit of work to be done but its a nice path so far Current Ride: Giant 2010 TCR Advanced 1
Re: Jerra Wetlands Cycle PathRode it today.
Spoke to a surveyor there (no other workers) who said that yes it is open but not officially open ! Signs and path markings have to be done yet. Guy indicated that contrators have unofficially opened it to prevent vandalism.. i didnt enquire further so not sure what that means. Its nice path and yes its raised to prevent flooding. Regards
Re: Jerra Wetlands Cycle PathHe probably meant to prevent people from "opening" it themselves.
I'm a bit confused. I'm pretty sure I found the start of it off Dairy Rd, but then the new path only went for a few hundred metres before I ended up on residential roads through the back of Kingston foreshore. Did I miss a lakefront path or something?
Re: Jerra Wetlands Cycle PathNope. The path only goes through a small part then you are back onto roads until you get around near the Old Bus Depot. I've read it will eventually follow the water front once all the development in that area is complete ie. 5years or so
Its a heap better now and you can steer well clear of the causeway Current Ride: Giant 2010 TCR Advanced 1
Re: Jerra Wetlands Cycle Path
Unless it's been raining in which case there is a massive long puddle completely blocking the road where CCC used to have the crit start/finish.
Re: Jerra Wetlands Cycle Path
hahahha i saw some kids on the roof having a peek inside today, didnt know it was the morgue, just thought it was forensics!!! good on em, looking for dead people hahah Lucas Hayden
Current Ride: BMC SSX01 ![]()
Re: Jerra Wetlands Cycle Path
hahahaha. Go check it out later in the year when it is open for science week, actually quite interesting if science is your thing. Current Ride: Giant 2010 TCR Advanced 1
Re: Jerra Wetlands Cycle PathI measured 28.5km yesterday. I didn't go around the edge of the lake at Lennox Gardens (just along the Flynn Drive bike path) but did take the detour out towards the Museum instead of up and over the hill at the ANU.
Steph
Re: Jerra Wetlands Cycle Path
That matches my measurements, I do Lennox Gardens (while they are doing the Comm bridge works) but skip the Museum leg. So prob with both the longer options it would clock in around 29km. Now i've got 15km, 20km or 29km options when i go around the lake Current Ride: Giant 2010 TCR Advanced 1
Re: Jerra Wetlands Cycle PathFrom my place over Comm Ave bridge and back is about 29km, Kings Ave not sure, and Dairy Flat Road about 41km.
19 posts
• Page 1 of 1
Who is onlineUsers browsing this forum: No registered users |
Bikes & Gear Online:
|