Windan Bridge East Perth
8 posts
• Page 1 of 1
Windan Bridge East PerthWestern side appears closed, at least from the Burswood end. Anyone shed any light?
Les
06' Giant TCR C1 08' Colnago CLX 07' Apollo Swift VW Jetta Diesel 5.5l/100km
Re: Windan Bridge East PerthNoticed this last night.. the western gate is locked, but the eastern gate and ramp is completely closed off? Couldn't see any sign of any notices or alike?
Trainer- Bianchi S9 Matta Reparto Corse Titanium
Weekender - Colnago CX-1 - SRAM Red - Selle SMP - FFWD 4D Carbon Project - 1980's Ricardo Elite - On its way to being a single speed
Re: Windan Bridge East PerthI noticed the usual flooding on the pathway near Burswood from the train on Monday morning and saw the fencing panels up this morning. I plan to ride that way later in the week, so will see what I can find out. The fence could only be seen on the southern side of the eastern end, so the northern side of the bridge may be open?
Are there gates on the bridge? I can't recall seeing any before, so will see if I can get some answers on Wednesday. Road - '09 Cervelo S1 | '07 Vivente Lugano | Late 90's Giant Kronos, Dirt - '08 Orbea Sherpa
Re: Windan Bridge East Perth
northern side of the bridge is open, nema problema.
Re: Windan Bridge East PerthI went home early yesterday, so never got all the info. Straight onto it this morning as I noticed railway fencing down on the Burswood end.
There are actually 2 bridges across the river. The road bridge is the Windan Bridge, and as roller mentioned, is still open. However, the Goongoongup Rail Bridge will be closed for several months. While googling to get the right spelling, I found this info from BWA. The bridge walk/cycle way that runs under Goongoongup rail bridge (adjacent to Windan bridge in East Perth) will be closed from Monday 22 August for about 7 months. The path on Windan Bridge will still be in operation. There will be no access to the bridge walkway for seven months while the work is being done. Fencing and signage will be in place. The path along Windan Bridge will still be available. The work involves: •Removal of the Principal Shared Path entering and exiting the south-east end of the bridge •Extensive earthworks •Drilling and construction of two piles •Final fabrication of the anchors •Drilling of anchor bore holes •Insertion of anchor and grouting •Fabricating and pouring of reaction blocks •Load testing of anchor •Excavation below the approach structure •Strengthening of the existing piles •Insertion of concrete panels Train services will continue as usual. For further information, email [email protected] Same info posted on the PTA site Road - '09 Cervelo S1 | '07 Vivente Lugano | Late 90's Giant Kronos, Dirt - '08 Orbea Sherpa
Re: Windan Bridge East PerthRemoval of the PSP but no reinstatement?
Re: Windan Bridge East PerthWith a guess, the re-instatement is probably not in the scope of the PTA work and will be done by 'others' once the PTA project work is complete. I should be able to get information from the relevant person on Monday. Road - '09 Cervelo S1 | '07 Vivente Lugano | Late 90's Giant Kronos, Dirt - '08 Orbea Sherpa
Re: Windan Bridge East PerthMy riding has been fairly minimal lately, but I have noticed from the train that the PSP has been re-opened this week. Looks like the time requirements blew out to more than the original 7 months, but the path appears to be back in place and in good condition.
Road - '09 Cervelo S1 | '07 Vivente Lugano | Late 90's Giant Kronos, Dirt - '08 Orbea Sherpa
8 posts
• Page 1 of 1
Who is onlineUsers browsing this forum: No registered users |
Bikes & Gear Online:
|