Postby Pushy » Tue Aug 23, 2011 8:55 am

Western side appears closed, at least from the Burswood end. Anyone shed any light?
Les
06' Giant TCR C1
08' Colnago CLX
07' Apollo Swift

VW Jetta Diesel 5.5l/100km
Pushy
 
Posts: 994
Joined: Wed Aug 15, 2007 1:02 am
Location: Freo WA

by BNA » Tue Aug 23, 2011 9:50 am

BNA
 

Re: Windan Bridge East Perth

Postby suff » Tue Aug 23, 2011 9:50 am

Noticed this last night.. the western gate is locked, but the eastern gate and ramp is completely closed off? Couldn't see any sign of any notices or alike?
Commuter - Bianchi Pista
MTB - Bianchi Jab 7400
Trainer- Bianchi S9 Matta Reparto Titanium
Weekender - Colnago CX-1 - SRAM Red - FFWD
suff
 
Posts: 234
Joined: Sat Jan 17, 2009 6:15 pm
Location: West Perth

Re: Windan Bridge East Perth

Postby Double-Gee » Tue Aug 23, 2011 11:19 pm

I noticed the usual flooding on the pathway near Burswood from the train on Monday morning and saw the fencing panels up this morning. I plan to ride that way later in the week, so will see what I can find out. The fence could only be seen on the southern side of the eastern end, so the northern side of the bridge may be open?
Are there gates on the bridge? I can't recall seeing any before, so will see if I can get some answers on Wednesday.
Road - '09 Cervelo S1 | '07 Vivente Lugano | Late 90's Giant Kronos, Dirt - '08 Orbea Sherpa
User avatar
Double-Gee
 
Posts: 164
Joined: Mon Jul 23, 2007 12:53 am
Location: hills.perth.wa.au

Re: Windan Bridge East Perth

Postby roller » Wed Aug 24, 2011 1:08 pm

Double-Gee wrote:The fence could only be seen on the southern side of the eastern end, so the northern side of the bridge may be open?


northern side of the bridge is open, nema problema.
Image
User avatar
roller
 
Posts: 1465
Joined: Mon Nov 26, 2007 5:17 pm
Location: embleton

Re: Windan Bridge East Perth

Postby Double-Gee » Thu Aug 25, 2011 11:13 am

I went home early yesterday, so never got all the info. Straight onto it this morning as I noticed railway fencing down on the Burswood end.

There are actually 2 bridges across the river. The road bridge is the Windan Bridge, and as roller mentioned, is still open. However, the Goongoongup Rail Bridge will be closed for several months. While googling to get the right spelling, I found this info from BWA.

The bridge walk/cycle way that runs under Goongoongup rail bridge (adjacent to Windan bridge in East Perth) will be closed from Monday 22 August for about 7 months. The path on Windan Bridge will still be in operation.

There will be no access to the bridge walkway for seven months while the work is being done. Fencing and signage will be in place. The path along Windan Bridge will still be available.

The work involves:

•Removal of the Principal Shared Path entering and exiting the south-east end of the bridge
•Extensive earthworks
•Drilling and construction of two piles
•Final fabrication of the anchors
•Drilling of anchor bore holes
•Insertion of anchor and grouting
•Fabricating and pouring of reaction blocks
•Load testing of anchor
•Excavation below the approach structure
•Strengthening of the existing piles
•Insertion of concrete panels

Train services will continue as usual.
For further information, email [email protected]


Same info posted on the PTA site
Road - '09 Cervelo S1 | '07 Vivente Lugano | Late 90's Giant Kronos, Dirt - '08 Orbea Sherpa
User avatar
Double-Gee
 
Posts: 164
Joined: Mon Jul 23, 2007 12:53 am
Location: hills.perth.wa.au

Re: Windan Bridge East Perth

Postby wellington_street » Thu Aug 25, 2011 11:30 am

Removal of the PSP but no reinstatement?
wellington_street
 
Posts: 765
Joined: Wed Mar 02, 2011 12:25 pm

Re: Windan Bridge East Perth

Postby Double-Gee » Thu Aug 25, 2011 3:08 pm

wellington_street wrote:Removal of the PSP but no reinstatement?
With a guess, the re-instatement is probably not in the scope of the PTA work and will be done by 'others' once the PTA project work is complete. I should be able to get information from the relevant person on Monday.
Road - '09 Cervelo S1 | '07 Vivente Lugano | Late 90's Giant Kronos, Dirt - '08 Orbea Sherpa
User avatar
Double-Gee
 
Posts: 164
Joined: Mon Jul 23, 2007 12:53 am
Location: hills.perth.wa.au

Re: Windan Bridge East Perth

Postby Double-Gee » Fri Oct 05, 2012 5:14 pm

My riding has been fairly minimal lately, but I have noticed from the train that the PSP has been re-opened this week. Looks like the time requirements blew out to more than the original 7 months, but the path appears to be back in place and in good condition.
Road - '09 Cervelo S1 | '07 Vivente Lugano | Late 90's Giant Kronos, Dirt - '08 Orbea Sherpa
User avatar
Double-Gee
 
Posts: 164
Joined: Mon Jul 23, 2007 12:53 am
Location: hills.perth.wa.au


Return to Western Australia

Who is online

Users browsing this forum: Rex



Support BNA
Click for online shops
Torpedo 7 Torpedo7 AU
Ground Effect Ground Effect NZ
Chain Reaction Cycles CRC UK
Wiggle Wiggle UK
Cycling Express Cycling Express
Ebay Ebay AU
ProBikeKit ProBikeKit UK
Evans Cycles Evans Cycles UK
JensonUSA Jenson USA
JensonUSA Competitive Cyclist