Curtin Avenue Realignment

Postby Aushiker » Tue Jan 29, 2013 10:54 am

The Premier of Western Australia, Colin Barnett in a election promise (the question of course is this a core promise or one that will be conveniently put aside after the election?) has announced that Curtin Avenue, south of the Marine Parade roundabout in Mosman Park will be realigned so that it runs along the railway line towards North Fremantle.

According the press release up to $40 million will be set aside for the realignment of Curtin Avenue. The big question for cyclists is how will this impact on Fremantle – Perth Principle Shared Path (PSP)? The press release states that “cyclists, too, have lobbied government for a safer path along the beach to Fremantle.” This does not sound promising as the draft WA Bicycle Network Plan 2012 – 2021 suggests that the existing PSP will be re-directed from Curtin Avenue to run along the beach front.

I have shared some more thoughts on this announcement here but for me it is unclear how this will impact the PSP. My understanding is that the PSP was to exit Curtin Avenue near Marine Parade and follow the beach (WA Bicycle Network Plan) and it does seem the fits with the announcement. On the other hand all major road re-constructions now include cycling infrastructure. Is it too much to expect that the PSP will be build along side the re-aligned Curtin Avenue?

Maybe time to let the Minister of Transport Troy Buswell now your views.

Regards
Andrew

88mph
Posts: 54
Joined: Fri Aug 31, 2012 11:36 am

Re: Curtin Avenue Realignment

Postby 88mph » Tue Jan 29, 2013 12:35 pm

Yep, I too was thinking the same thing.

It does seem that the Government does factor PSP into new builds, such as the bridges and tunnels along Stubbs Terrance between Karrakatta and Shenton Park. Plus the PSP to nowhere at Cottesloe Station.

However the recent Leighton Beach development saw a PSP constructed along the ocean front, mind you this PSP is essentially more dangerous than the road due to all of the 'architectural' chicanes and road crossings, plus its generally over crowded.

Heres hoping they build the PSP along the new road/rail artery and push through to Tydeman Road - theres loads of space along the railway for it. The next sector over the harbour will be the one not worth holding our breath for!

wellington_street
Posts: 1791
Joined: Wed Mar 02, 2011 1:25 pm

Re: Curtin Avenue Realignment

Postby wellington_street » Tue Jan 29, 2013 3:57 pm

Aushiker wrote:This does not sound promising as the draft WA Bicycle Network Plan 2012 – 2021 suggests that the existing PSP will be re-directed from Curtin Avenue to run along the beach front.
Where does it say that?

The long term plan is along the rail line, as shown in the map on page 27. The discussion on page 25 indicates that in the 10 year horizon, the PSP will only reach as far as Marine Pde/Montessori School and then connect to the RSP/Curtin Ave sealed shoulders.

-----

So I guess the tunnel under the rail line and connection to Stirling Highway in the vicinity of Marine Pde/Wellington St is off the cards then?

Shiny Side Up
Posts: 52
Joined: Thu Jan 14, 2010 11:09 am

Re: Curtin Avenue Realignment

Postby Shiny Side Up » Tue Jan 29, 2013 6:43 pm

The scariest part of the entire trip is the Freo traffic bridge. I'm not sure what can be done to make crossing the river here safer, but it really makes you pucker when there's a few trucks around.

wellington_street
Posts: 1791
Joined: Wed Mar 02, 2011 1:25 pm

Re: Curtin Avenue Realignment

Postby wellington_street » Tue Jan 29, 2013 6:47 pm

Shiny Side Up wrote:The scariest part of the entire trip is the Freo traffic bridge. I'm not sure what can be done to make crossing the river here safer, but it really makes you pucker when there's a few trucks around.
If the traffic bridge gets replaced, the western footway will probably be rebuilt to PSP standard.

In the meantime, use the path? A fair bit slower but certainly a lot less fear inducing.

User avatar
Aushiker
Posts: 22395
Joined: Tue Jun 05, 2007 1:55 pm
Location: Walyalup land
Contact:

Re: Curtin Avenue Realignment

Postby Aushiker » Tue Jan 29, 2013 11:38 pm

wellington_street wrote:
Aushiker wrote:This does not sound promising as the draft WA Bicycle Network Plan 2012 – 2021 suggests that the existing PSP will be re-directed from Curtin Avenue to run along the beach front.
Where does it say that?
Page 25 of the Western Australian Bicycle Network Plan (Draft) states:

The existing PSP from Perth finishes at the Grant Street Station in Cottesloe. From this point to Fremantle cyclists are required to travel on-road in sealed shoulders and through signalised intersections that do not have provisions for cyclists.

The first stage of the PSP extension will continue through to the Beehive Montessori School. The path will then terminate at this point with a road crossing to join the existing coastal Recreational Shared Path. The current planning for the ultimate upgrade of Curtin Avenue will need to be taken into account during the assessment of alignment options.

The full completion of the PSP south of this point is unlikely to be achieved within the 10 year timeframe for the plan. However, opportunities will be taken to include PSPs in the planning for other projects such as the replacement of the Fremantle Traffic bridge. The construction timing of such projects will then influence further stages of the PSP extension
(my bold)

Regards
Andrew
Last edited by Aushiker on Tue Jan 29, 2013 11:58 pm, edited 5 times in total.

User avatar
Aushiker
Posts: 22395
Joined: Tue Jun 05, 2007 1:55 pm
Location: Walyalup land
Contact:

Re: Curtin Avenue Realignment

Postby Aushiker » Tue Jan 29, 2013 11:41 pm

88mph wrote:However the recent Leighton Beach development saw a PSP constructed along the ocean front, mind you this PSP is essentially more dangerous than the road due to all of the 'architectural' chicanes and road crossings, plus its generally over crowded.
That is not a PSP, it is really a recreational shared path and should be riden with that in mind.

Recreational Shared Paths (RSP) are described in the draft Western Australian Bicycle Network Plan on page 23 as:

These generally follow river foreshores and beachfronts and are not direct routes to destinations. As such, they are also very popular with pedestrians and other users and, consequently, are not intended for high-speed riders and fast commuters. However, some RSPs function as commuter routes due to their locations and require construction to appropriate standards. A comprehensive river and beach RSP network has been the consistent intention of successive governments.

88mph wrote:Heres hoping they build the PSP along the new road/rail artery and push through to Tydeman Road - theres loads of space along the railway for it.
There is a new connection shared path between the North Fremantle Train Station and Pearse Street/Tydeman Road. I haven't riden it so no first hand comments on how it has worked out.

Andrew

wellington_street
Posts: 1791
Joined: Wed Mar 02, 2011 1:25 pm

Re: Curtin Avenue Realignment

Postby wellington_street » Wed Jan 30, 2013 12:00 pm

Aushiker wrote:
wellington_street wrote:
Aushiker wrote:This does not sound promising as the draft WA Bicycle Network Plan 2012 – 2021 suggests that the existing PSP will be re-directed from Curtin Avenue to run along the beach front.
Where does it say that?
Page 25 of the Western Australian Bicycle Network Plan (Draft) states:
Yeah, so no the PSP is not going via the foreshore, it's just the next stage will terminate at the Montessori school with appropriate connections to the RSP. No different to what is there now where you have a choice between the shoulders of Curtin Ave or the RSP along that bit of the waterfront.

User avatar
Aushiker
Posts: 22395
Joined: Tue Jun 05, 2007 1:55 pm
Location: Walyalup land
Contact:

Re: Curtin Avenue Realignment

Postby Aushiker » Tue Feb 05, 2013 11:48 am

There is an article in the Fremantle Gazette on the realignment. Nothing of substance in the article.

Andrew

wexford
Posts: 275
Joined: Mon Mar 14, 2011 7:26 pm
Location: Perth, Western Australia

Re: Curtin Avenue Realignment

Postby wexford » Tue Feb 05, 2013 12:18 pm

Shiny Side Up wrote:The scariest part of the entire trip is the Freo traffic bridge. I'm not sure what can be done to make crossing the river here safer, but it really makes you pucker when there's a few trucks around.
Although I find the bridge to be a remarkably courteous area so far as the truckies are concerned, I still don't feel so comfortable there so these days I duck from Tydeman St into Burns St (last interspection before the lights at Stirling Hwy) and take the western path instead. This also gives me a more straightforward drop onto the river than the one-way road up from the Left Bank pub.

88mph
Posts: 54
Joined: Fri Aug 31, 2012 11:36 am

Re: Curtin Avenue Realignment

Postby 88mph » Fri Feb 08, 2013 10:21 am

Aushiker wrote:There is an article in the Fremantle Gazette on the realignment. Nothing of substance in the article.

Andrew
I just hope this is the start of something good for Freo bike paths.

What I mean is, all paths lead to Freo (well almost) but once you're in Freo the infrastructure is almost non-existent. There is no clear defined route to ride through Freo Centre - continual bottle necks and stop-starts.

jlh
Posts: 263
Joined: Mon Jul 16, 2012 12:17 pm

Re: Curtin Avenue Realignment

Postby jlh » Fri Feb 08, 2013 12:35 pm

I heard that the Freo mayor is very pro bike, a rider himself and even sold his car. So wouldn't be surprised if cycling infrastructure is improved over his term.

User avatar
Thoglette
Posts: 6605
Joined: Thu Feb 19, 2009 1:01 pm

Re: Curtin Avenue Realignment

Postby Thoglette » Mon Feb 25, 2013 12:54 am

Shiny Side Up wrote:The scariest part of the entire trip is the Freo traffic bridge. I'm not sure what can be done t
With any luck some gubberm'nt engineer will declare it unsafe for vehicular use and the no-change-ever brigade won't let it be replaced.

Ergo: only solution is to keep it for peds and bikes.

OK, I know, back off the medication a notch or two. But can't an old fella dream?
Stop handing them the stick! - Dave Moulton
"People are worthy of respect, ideas are not." Peter Ellerton, UQ

User avatar
Aushiker
Posts: 22395
Joined: Tue Jun 05, 2007 1:55 pm
Location: Walyalup land
Contact:

Re: Curtin Avenue Realignment

Postby Aushiker » Mon Feb 25, 2013 10:49 am

Don't quote me but IIRC a discussion last week, there is some talk about taking the path over the river on the side of the railway bridge. I may have misunderstood this and it maybe 20 years away but there is at least some awareness of the issue with the relevant government departments.

Andrew

wellington_street
Posts: 1791
Joined: Wed Mar 02, 2011 1:25 pm

Re: Curtin Avenue Realignment

Postby wellington_street » Mon Feb 25, 2013 12:12 pm

Aushiker wrote:Don't quote me but IIRC a discussion last week, there is some talk about taking the path over the river on the side of the railway bridge. I may have misunderstood this and it maybe 20 years away but there is at least some awareness of the issue with the relevant government departments.
I have heard this as well and I think it is pure fantasy. The way the bridge was designed, the WAGR even had to cantilever the overhead stanchions to electrify the line. With my (admittedly limited) knowledge of bridge engineering, I don't believe you could cantilever anything else off the present structure.

That means new piers are required in which case, the economics don't come close to stacking up, especially when the traffic bridge will be replaced anyway, and you can build PSP quality paths on both sides, only 100m or so upstream.